FRANCE - February / March 2004

Before this visit some more furniture was refurbished ready to take over.

The main task was to install a shower cubicle and the associated plumbing and drainage.

. .

The floor was tidied up and more tiles laid ... apart from a small area near the back door, which requires further attention to the floor level, to allow the back door to open fully.

Since these pictures were taken the loo / shower room door frame is now stained dark brown and two wall lights have been fixed. Some of the electrical wiring has also been identified ready to receive switches and sockets.