FRANCE ... April - May 2005


After tidying up in the main house a start was made on the upstairs room of the other building.

............................

The fire place was removed back to what turned out to be a second fireplace: I decided not to strip back to the first. The fire place will eventually house a cupboard or wardrobe. All the exterior walls have been lined with insulating fibreglass before fitting metal studding to carry a plasterboard covering.

The floor had to be raised 2 to 3 inches to give some degree of level. In fact I decided to renew the floor completely. This also gave an opportunity to sort out the electrics for this room and the room below.

The main beam was uncovered and a start made on cleaning it. It became clear that the ceiling boards also had to be brought down by about 2 or 3 inches in one corner. In this room all the walls taper, or have at least two angles, which made things more interesting !

The locals make full use of the nearby walks and facilities at the weekend. The following pictures are of the River Mayenne near the confluence with the River Varenne.

 

BACK TO PHOTOS and TRAVEL INDEX